TR |  EN |  RU |  AR
Officium Beytepe Project
Detaylar

Officium Beytepe Project's heating and under floor heating chemical flushing operations was successfully completed while the system was fully online. Hasmer Group's project was undertaken by Demir Elektromekanik İmilat İnş.Tur.LTD.ŞTİ and consists of 114 offices and 23 retail stores in a single block of 22 floors. Our expert staff has constantly tracked the water parameters with mobile and laboratory aided analysis. Parameters have been stabilized in ideal ranges and the results were reported for final project delivery.